Ref 5 Assigned Readings:Chapter 9. Project Scheduling: Networks, Duration Estimation, and Critical PathChapter 10. Project Scheduling: Lagging, Crashing, a

Ref 5 Assigned Readings:Chapter 9. Project Scheduling: Networks, Duration Estimation, and Critical PathChapter 10. Project Scheduling: Lagging, Crashing, a

Click here to Order a Custom answer to this Question from our writers. It’s fast and plagiarism-free.

Ref 5 Assigned Readings:Chapter 9. Project Scheduling: Networks, Duration Estimation, and Critical PathChapter 10. Project Scheduling: Lagging, Crashing, and Activity Networks Initial Postings: Read and reflect on the assigned readings for the week. Then post what you thought was the most important concept(s), method(s), term(s), and/or any other thing that you felt was worthy of your understanding in each assigned textbook chapter.Your initial post should be based upon the assigned reading for the week, so the textbook should be a source listed in your reference section and cited within the body of the text. Other sources are not required but feel free to use them if they aid in your discussion.Also, provide a graduate-level response to each of the following questions:

Consider a project such as moving to a new neighborhood, completing a long-term school assignment, or even cleaning your bedroom. Develop a set of activities necessary to accomplish that project, and then order them in a precedence manner to create sequential logic. Explain and defend the number of steps you identified and the order in which you placed those steps for best completion of the project.
In crashing a project, we routinely focus on those activities that lie on the critical path, not activities with slack time. Explain why this is the case.

[Your post must be substantive and demonstrate insight gained from the course material. Postings must be in the student’s own words – do not provide quotes!] [Your initial post should be at least 450+ words and in APA format (including Times New Roman with font size 12 and double spaced). Post the actual body of your paper in the discussion thread then attach a Word version of the paper for APA review]

Looking for this or a Similar Assignment? Click below to Place your Order